Prior declaration - Construction and works

Find here the information and procedure to follow for the prior declaration of a construction or minor works.

Last updated November 05, 2026

Presentation of the procedure

The prior declaration (DP) is a simplified formality applicable to minor works or construction projects that do not require a building permit. It allows the Collectivité to verify the project's compliance with the PADSM (Local Urban Development Plan) before work begins.

Who is this approach aimed at?

• Individuals carrying out small works on an existing building

• Owners wishing to build an annex (garden shed, carport, fence, uncovered swimming pool of less than 100 m²)

• Any person carrying out work that modifies the exterior appearance of a building without significant expansion

In what cases is this procedure required?

Prior declaration is required in particular for: any new construction between 5 and 20 m² of footprint or floor area (40 m² in the urban area of ​​the PADSM for extensions of individual houses), modifications to the facade or roof changing the external appearance, the creation of an opening, the installation of a fence on the boundary line, the installation of a swimming pool with a basin of less than 100 m².

What is the timeframe for the procedure?

1 month from the date of submission of the complete file (2 months if the land is located in a protected area).

How do I carry out this process?

Monitoring and validity of the authorization

The decision of no objection is valid for 3 years. The work must begin within this period.